We have successfully completed many piling projects. Three examples are given below:

John Ross Highway Bridge

We supplied 5700m of 1300mm OD x 12mm steel pile casings to CMC Da Rivenna (the main contractors). The pile driving was carried out by Dura Piling. The project duration was 6 months and we handled all on site welding for the client.

Richards Bay Liquid Bulk Terminal

3725m of 700mm OD x 16mm steel casings were supplied for the construction of a new jetty. The main contractor was Stefanutti Stocks and the client was PORTNET. The pile driving was carried out by ESOR – FRANKI and the project duration was 7 months. Once again , all on site welding and corrosion protection was successfully undertaken by BMFA.

Coffer Dam , Malawi

1000m of 914mm OD x 16mm steel pile casings were supplied to Dura Piling. The project was completed in 6 weeks.